  1. Step 1: Select an appropriate product for your project.

    Sheet applied waterproofing differs from fluid applied systems, which are usually sprayed on and can cover irregular surfaces quickly and easily.

    For large projects with embedded appurtenances, fluid applied materials may be more suitable, but for a simple, flat wall, sheet applied material can be applied and back-filled in less time, with less mess.

    Here are some other things to consider:
    Does the contract documents specify a certain type, or even brand of material to be used? If so, you should submit the material you intend to use for review by the project architect or engineer responsible for the waterproofing scope of work.

    Does the schedule require fast performance of this work so that the area can be back-filled for other work to begin as quickly as possible? Sheet applied membrane waterproofing can be back-filled the day of application, where fluid applied coatings may require multiple coats, with a curing interval between coats.

    Do you have the proper equipment and trained personnel to apply other types of waterproofing? Sheet applied membrane waterproofing can be installed with minimal tools, and the cleanup process is fairly straight-forward and easy.
  2. Step 2: Figure the amount of materials you will need to complete your application.

    Adding 10% to allow for waste, and for materials that require a primer, it may be a good idea to add 50% more than the recommended amount for very porous surfaces, as the primer may not give equal coverage.

    An example would be the application rate on cast in place concrete might be 175 square feet per gallon, but concrete block, being more porous, would take much more primer to give good results., For concrete block walls, grout-fill all the cells which require this step, point up mortar joints, and allow complete drying before continuing., Go a few inches below the required depth of the waterproofing so you will have room to work., On a cast concrete footing you may see nails, wires, or sharp pieces of aggregate sticking out, make sure these are removed by chipping or grinding.,, Using compressed air or a leaf blower is very effective for this step, but careful sweeping with an ordinary broom will suffice., Buying your materials from one manufacturer is the best way to insure they will perform as expected.

    Other things to remember are:
    Read the health and safety statement on the containers.

    Make sure you have a Material Safety Data Sheet (MSDS) if you are required to, such as when the project is governed by OSHA.

    Read the label (did I already mention it?) Read the installation/application instructions carefully.

    Buy tools and supplies for applying the materials.

    Buy safety equipment, including gloves, safety glasses, and a respirator if required.

    Buy a suitable solvent to clean up tools if required. ,, Most primers are a contact cement type adhesive, and can be applied with a paint roller or brush.

    Again, make sure the surface is clean and dry before applying., In very dusty conditions, you want to cover the primer with the sheet material as soon as practice, since the dust will adhere to the primer, reducing its bond strength., Since the adhesive side of the membrane is covered with a wax coated paper sheet for protection, working with long lengths is difficult, so beginning with six to eight foot lengths is suggested., This will be the bottom when you lay or hang the membrane on the surface you are waterproofing., Hold it level or flat on the surface, making sure the edge with the exposed adhesive side is in the correct position before allowing it to contact the primed surface.

    Once the membrane's adhesive side contacts the primed surface, it will immediately bond, and is very difficult to reposition.,, In some situations, it is better to apply the sheet of material horizontally, at other times, you may find you need to work from the bottom up., This eliminates an unsealed seam, and makes getting a precise fit unnecessary.

    Smooth, straight corners are much easier to wrap than irregular or crooked ones., Making a tight fitting cut is essential.,, Styrofoam or polyurethane sheet insulation can be a good choice for this step, but not if your back-fill contains large, sharp rocks, because then you may need to use a more durable product., Clean up your tools, and store or dispose of left over materials in a safe manner.
  3. Step 3: Complete the construction of the foundation and wall to be waterproofed

  4. Step 4: and allow all materials used to dry and cure sufficiently for the waterproofing to adhere and perform properly.

  5. Step 5: Excavate excess soil around the perimeter of the foundation if the waterproofing will turn down on its edges.

  6. Step 6: Clean the foundation of loose materials

  7. Step 7: and any sharp objects that may damage the waterproofing or prevent it from bonding.

  8. Step 8: Clean the walls

  9. Step 9: as well

  10. Step 10: removing any splatters of mortar or concrete

  11. Step 11: and fill any voids.

  12. Step 12: Sweep the entire area to be covered with waterproofing one last time to be sure no dust or debris remains on it.

  13. Step 13: Check the materials you have purchased to do the project

  14. Step 14: to make sure all components are compatible

  15. Step 15: and that you have enough to complete it.

  16. Step 16: Use a moisture meter to insure the wall is dry before beginning application of waterproofing.

  17. Step 17: Paint on primer according to container instructions if a primer is required.

  18. Step 18: Allow primer to dry until tacky

  19. Step 19: but do not allow to completely dry

  20. Step 20: or it will not bond as well.

  21. Step 21: Cut a length of the membrane material to a length you are comfortable working with.

  22. Step 22: Lay the membrane on a flat surface (if available) and peel the paper away from the adhesive side to half the width of the sheet.

  23. Step 23: Lift the sheet of membrane so the covered section is in your hands with the folded protective paper in your grip as well

  24. Step 24: and carry it to the location you are installing it at.

  25. Step 25: Always work from the lowest point or elevation upward

  26. Step 26: so that subsequent laps allow the upper membrane to lap over the lower

  27. Step 27: reducing the chance of leakage.

  28. Step 28: Press the adhesive side of the membrane against the primed surface to seal it on the edge you have positioned

  29. Step 29: and when you are confident it is right

  30. Step 30: begin peeling the remaining protective sheeting off the membrane

  31. Step 31: pressing the adhesive against the primed surface as you go.

  32. Step 32: Allow the membrane to wrap corners.

  33. Step 33: Seal any protruding items such as embedded bolts

  34. Step 34: or fittings with a suitable mastic

  35. Step 35: then cut a flashing piece of membrane to fit over the mastic to keep it in place.

  36. Step 36: Smooth or roll out any wrinkles and air pockets

  37. Step 37: pressing the entire surface so it is bonded well to the primed surface you are applying the material to.

  38. Step 38: Place a protective

  39. Step 39: non biodegradable material over the finished membrane so rocks or other sharp objects won't damage it when the wall or foundation is back-filled.

  40. Step 40: Back-fill the excavated area with suitable fill material

  41. Step 41: compacting it in lifts (6 to 12 inch layers) so that settling doesn't occur later.

Detailed Guide

Sheet applied waterproofing differs from fluid applied systems, which are usually sprayed on and can cover irregular surfaces quickly and easily.

For large projects with embedded appurtenances, fluid applied materials may be more suitable, but for a simple, flat wall, sheet applied material can be applied and back-filled in less time, with less mess.

Here are some other things to consider:
Does the contract documents specify a certain type, or even brand of material to be used? If so, you should submit the material you intend to use for review by the project architect or engineer responsible for the waterproofing scope of work.

Does the schedule require fast performance of this work so that the area can be back-filled for other work to begin as quickly as possible? Sheet applied membrane waterproofing can be back-filled the day of application, where fluid applied coatings may require multiple coats, with a curing interval between coats.

Do you have the proper equipment and trained personnel to apply other types of waterproofing? Sheet applied membrane waterproofing can be installed with minimal tools, and the cleanup process is fairly straight-forward and easy.

Adding 10% to allow for waste, and for materials that require a primer, it may be a good idea to add 50% more than the recommended amount for very porous surfaces, as the primer may not give equal coverage.

An example would be the application rate on cast in place concrete might be 175 square feet per gallon, but concrete block, being more porous, would take much more primer to give good results., For concrete block walls, grout-fill all the cells which require this step, point up mortar joints, and allow complete drying before continuing., Go a few inches below the required depth of the waterproofing so you will have room to work., On a cast concrete footing you may see nails, wires, or sharp pieces of aggregate sticking out, make sure these are removed by chipping or grinding.,, Using compressed air or a leaf blower is very effective for this step, but careful sweeping with an ordinary broom will suffice., Buying your materials from one manufacturer is the best way to insure they will perform as expected.

Other things to remember are:
Read the health and safety statement on the containers.

Make sure you have a Material Safety Data Sheet (MSDS) if you are required to, such as when the project is governed by OSHA.

Read the label (did I already mention it?) Read the installation/application instructions carefully.

Buy tools and supplies for applying the materials.

Buy safety equipment, including gloves, safety glasses, and a respirator if required.

Buy a suitable solvent to clean up tools if required. ,, Most primers are a contact cement type adhesive, and can be applied with a paint roller or brush.

Again, make sure the surface is clean and dry before applying., In very dusty conditions, you want to cover the primer with the sheet material as soon as practice, since the dust will adhere to the primer, reducing its bond strength., Since the adhesive side of the membrane is covered with a wax coated paper sheet for protection, working with long lengths is difficult, so beginning with six to eight foot lengths is suggested., This will be the bottom when you lay or hang the membrane on the surface you are waterproofing., Hold it level or flat on the surface, making sure the edge with the exposed adhesive side is in the correct position before allowing it to contact the primed surface.

Once the membrane's adhesive side contacts the primed surface, it will immediately bond, and is very difficult to reposition.,, In some situations, it is better to apply the sheet of material horizontally, at other times, you may find you need to work from the bottom up., This eliminates an unsealed seam, and makes getting a precise fit unnecessary.

Smooth, straight corners are much easier to wrap than irregular or crooked ones., Making a tight fitting cut is essential.,, Styrofoam or polyurethane sheet insulation can be a good choice for this step, but not if your back-fill contains large, sharp rocks, because then you may need to use a more durable product., Clean up your tools, and store or dispose of left over materials in a safe manner.

About the Author

R

Richard Robinson

Enthusiastic about teaching practical skills techniques through clear, step-by-step guides.

127 articles
View all articles

Rate This Guide

--
Loading...
5
0
4
0
3
0
2
0
1
0

How helpful was this guide? Click to rate: